
The plant will add 80MW of power generation capacity from a non-fossil fuel source. (Image source: ALEC)
A joint venture between ALEC Engineering and Contracting (ALEC) and BUTEC has been awarded the contract to construct Abu Dhabi’s inaugural waste-to-energy (WtE) plant